Drone Video of Altex Built Air-Cooled Heat Exchanger Bays
July 9, 2020
New video showcasing two recent air-cooler completions inside our heavy-lift bay (110T+). These air-coolers were engineered and built by Altex in Edmonton to add capacity to an existing facility in Fort Saskatchewan.
Each bay is 14 ft wide by 42 ft long and designed to be identical to the existing bays on site.
The existing air-cooler drawings were incomplete, so Altex made multiple site visits to ensure a perfect match. Also in the video - shots of our facility on an usually sunny day this year, and multiple large shell & tube heat exchangers.
470