News

Economizer Repair - 138,000 lbs

August 23, 2021

Cal Kveder 0 106

What a month it's been already! Anyone else not ready for summer to end yet?

Last week, Altex was busy loading an economizer onto the trailer for shipment back to site using a two-crane lift.

This unit weighs 138,000 lbs and was in our shop for repairs and replacement of the tube bends.

Made In Canada

July 1, 2021

Cal Kveder 0 226

Manufactured with pride in Canada!

Altex Industries is celebrating its 20th Anniversary in 2021, and we could not be here without our dedicated and talented tradespeople in the shop and field divisions.

Field Services Teamwork

June 16, 2021

Cal Kveder 0 333

Recently, Altex Industries played a major role in a refinery complex’s 2021 Turnaround. The turnaround required over 600,000 manhours, involved over 1550 pieces of equipment, and an investment of over $80 million.

You don’t execute a turnaround of this size without ...<continued>

Engineering

May 26, 2021

Cal Kveder 0 444

Engineering - It's built-in!

Altex Industries is celebrating it's 20th Anniversary in 2021, and this is the third video in a series that introduces the great team behind Altex.

Altex Industries has Engineering and Design Horsepower

August 14, 2020

Ryan Fowler 0 694

Altex Industries has the engineering and design horsepower needed to build heat exchangers in Canada for some of the most challenging services in the world. Our in-house Edmonton team is here to help you navigate the ever-changing pressure-vessel regulations, specifications, and ASME Codes. This is true for... (continued)

RSS